Appointments

  • 2024 – Oversized Pavers Added with backyard landscaping

  • 2023 – Added tile floor in guest bedroom, replaced commode in guest bath

  • 2022 – Replaced gas log fireplace set and propane tank, shower fixtures added to primary suite

  • 2017 – Replaced roof, Tile flooring added to Primary bedroom and 2nd bedroom.

  • 2014 - Living Area flooring added

  • 2013 - Elfa© dual closet makeovers in Primary Bedroom

  • 2012 – Wood-like tile flooring in Living, Primary bedroom and 3rd bedroom/office - Engineered hardwood

  • 2011 - Remodeled both baths; added tile in hallway; Replaced & Relocated to attic Trane HVAC and Water Heater

  • 2009 - Exterior Stucco added, replaced Masonite ; painted exterior stucco and trim, (original Austin stone, untouched)

  • 2008 - Remodeled Kitchen, Dining and Entryway; added front door

  • 2000 - Replaced garage door

  • Other improvements:  garage door opener