
Appointments
2024 – Oversized Pavers Added with backyard landscaping
2023 – Added tile floor in guest bedroom, replaced commode in guest bath
2022 – Replaced gas log fireplace set and propane tank, shower fixtures added to primary suite
2017 – Replaced roof, Tile flooring added to Primary bedroom and 2nd bedroom.
2014 - Living Area flooring added
2013 - Elfa© dual closet makeovers in Primary Bedroom
2012 – Wood-like tile flooring in Living, Primary bedroom and 3rd bedroom/office - Engineered hardwood
2011 - Remodeled both baths; added tile in hallway; Replaced & Relocated to attic Trane HVAC and Water Heater
2009 - Exterior Stucco added, replaced Masonite ; painted exterior stucco and trim, (original Austin stone, untouched)
2008 - Remodeled Kitchen, Dining and Entryway; added front door
2000 - Replaced garage door
Other improvements: garage door opener